CROW WING TOWNSHIP LAND USE APPLICATION
APPLICATION:
A. Applicant shall complete Land Use Application and submit to the Zoning Administrator.
B. Application shall be accompanied by a site plan drawing that is complete with the following minimum information (as
close to scale as possible):
- Size of parcel
- Location on the parcel of all existing structures, their square footage and distance from all property lines, setbacks
(including road, bluff, and shoreline) and each other
- Location on the parcel of all proposed structures and their square footage, distance from all property lines, setbacks
(including road, bluff, and shoreline) and each other
- Location on the parcel of existing and proposed sewage treatment systems and wells and their distance from property
lines, structures and each other
- Existing and/or proposed square footage of the driveway (gravel and paved), access roads, parking, sidewalks
***If a new driveway in being construction from a Township road, please contact the Township Roads Supervisor, Doug Kern,
at (218) 821-2021 for an entry permit***
C. Application shall include drawings showing number of bedrooms in the structure.
D. Application shall include elevation drawings showing proposed structure height.
E. Application shall include Sewer Compliance Inspection certificate.
F. Applicant shall include the signature of the title owner of the property.
REVIEW:
A. The Planning and Zoning Administrator shall review the application for completeness and assign a reference number to
application, plans, and any other attachments. Staff will indicate on the application the date that the application is complete.
The applicant will be notified where additional information is needed.
B. The Staff shall, based on submittals, compute the Land Use Permit Fee. This fee shall be paid by the applicant at the
time the application is submitted.
ACTION:
In order to obtain a Land Use Permit, the following must happen:
A. The Zoning Administrator must review and approve the Sewer Compliance Inspection report.
B. The Township Clerk must verify all current billings and insure that the applicant is current on all payments.
C. The Zoning Administrator must insure that the permit fee has been collected.
D. The Zoning Administrator must insure that the proposed improvements meet the requirements of the Ordinance.
PLEASE NOTE: The Township has 60 days in which to review and make a decision on land use applications, although the Township
strives to process all applications as soon as they are received. To avoid delays, applicants should allow themselves as much
time as possible between the time they submit their application and the time they wish to begin construction. Close coordination
with the Township Staff during the project design phase and submittals that are complete and accurate will help applicants
avoid delays. No construction can begin until the permit is complete and approved.
REVISED: January 2020
CROW WING TOWNSHIP
LAND USE PERMIT APPLICATION
Name of Applicant____________________________________
Property Address (E911#) ___________________________
Mailing Address ____________________________________
(if different than above)
City, State, Zip __________________________________
Phone_______________________________________________
E-mail _____________________________________________
Applicant is :
Legal Owner ( ) Contract Buyer ( )
Option Holder ( ) Agent ( )
Other _____________________________________________
TITLE HOLDER OF PROPERTY: (if other than applicant)
Name ______________________________________________
Address ___________________________________________
City, State, Zip __________________________________
Signature of Owner, authorizing application (required):
____________________________________________________
(By signing the owner is certifying that they have read and understood the instructions accompanying this application.)
Signature of Applicant (if different than owner):
___________________________________________________
(By signing the applicant is certifying that they have read and understood the instructions accompanying this application.)
Property ID # (15 digit # on Tax Statement)
___________________________________________________
Zoning District ______________________
Will an address assignment (E911#) be needed? __________
State nature of request in detail: (What are you proposing for the property? If a new structure, indicate height and
foundation type)
________________________________________________________
________________________________________________________
________________________________________________________
Approved by the Zoning Administrator:
_______________________________________________________
Date: ________________________________________________
REVISED: January 2020
CHECKLIST
_____ Completed application, including signature of property owner
_____ Fee
_____ Sewer Compliance Inspection Report
(5 years from installation date - New Installation)
(3 years from installation date - Existing system)
_____ All current Township charges paid
_____ No outstanding violations
_____ Site plan as close to scale as possible with the following information, as a minimum (unless waived by P&Z Administrator):
____ Size of parcel and dimensions
____ All existing structures, their square footage, height, distance from all property lines and setbacks (including road,
bluff and lake OHW level) and each other
____ All proposed structures, their square footage, height, distance from all property lines and setbacks (including road,
bluff and lake OHW level) and each other
____ Location on the parcel of existing and proposed sewage treatment systems (ISTS) and wells and their distance from
property lines, structures and each other
____ Existing and/or proposed square footage of the driveway (gravel and paved), access roads, parking, sidewalks
CROW WING TOWNSHIP CONTACT INFORMATION
Planning and Zoning Administrator:
Justin Burslie
Sourcewell
202 12th Street NE
PO Box 219
Staples, MN 56479
Phone: (218) 895-4151
justin.burslie@sourcewell-mn.gov
REVISED: JANUARY 2020
|