Crow Wing Township Planning and Zoning Department

ZONING PERMITS

New Construction:

Residential:

Up to 1000 s.f. of Ground Cover: $250
1001 s.f. to 2000 s.f.Ground Cover: $500
2001 s.f. to 3000 s.f. Ground Cover: $750
3001 s.f. and greater Ground Cover: $1000

Commercial (including plan review fee)

Up to 1000 s.f. Ground Cover: $400
1001 s.f. to 2000 s.f. Ground Cover: $500
2001 s.f. to 5,000 s.f. Ground Cover: $750
5001 to 10,000 s.f. Ground Cover: $1000
10,001 s.f. and greater Ground Cover: $1250

Commercial Storage Building (no Sewer or Water) per building: $400

**After the fact permits (Paid at the time Permit is Issued) Triple Original Fee**

Additions/Accessory Structures

Residential Accessory Structure or Addition

Less than 100 s.f. Ground Cover: $25
100 s.f. - 200 s.f. Ground Cover: $100
201s.f. -400 s.f. Ground Cover: $125
401s.f. -600 s.f. Ground Cover: $175
601 s.f. to 1000 s.f. Ground Cover: $250
1001 to 2000 s.f. Ground Cover: $300
Greater than 2000 s.f. Ground Cover: $500

Roof Reconstruction: $75

Commercial Accessory Structure or Addition includes plan review fee

Up to 1000 s.f. Ground Cover: $300
1001 to 2000 s.f. Ground Cover: $400
2001 to 5,000 s.f. ground cover: $500
5001 to 10,000 s.f. Ground Cover: $750
10,001 s.f. and greater: $1000

Commercial multi-storage buildings-no water or sewer-(Per Building): $400

Agricultural Accessory Structures: $100

Seasonal Travel Trailer Placement: $100

Signs $1.00 per s.f. up to 200 s.f.: $200

**After the fact permits (Paid at the time Permit is Issued) Triple Original Fee**

Sewage Treatment Systems:

These Costs Are in Addition to Septic System Permit Fees:

Residential (Includes review, approval of design, and inspection): $150

Adopted February 14, 2017

Commercial (Prior Plan Approval Required)
Small Flow Systems (Less than 1000 gal/day): $250
Large Flow Systems (1000 gal. /day or larger): $500
Includes review, approval of design, and inspection
Re-inspection Fee: $100

**After the fact permits (Paid at the time Permit is Issued) Triple Original Fee**

Dirt Moving in Shoreland Area

Sand Blanket in Shore Impact Zone* $100
Dirt Moving * 0-30 yds in SIZ: $250
0-50 yds in CIZ $150
10-100 yds in RLZ $75

Permits needing Variances

+ 30 yds in SIZ $500
+ 50 yds in CIZ $500
+ 100 yds in RLZ $500

**After the fact permits (Paid at the time Permit is Issued) Triple Original Fee**

*includes dirt moving/fill in wetland area with SWCD inspection*

Dirt Moving or Fill in excess of amounts allowed by Ordinance shall require a public hearing and appropriate land use application process.

Licenses/ Special Fees:

Gravel Pit Operation: $500
Plus Re-inspection Fee: $100
Plus Minimum: $5,000 Bond

Zoning Ordinance: $15

Comprehensive Plan: $25

Subdivision Ordinance: $5

Misc. Copies $.25 per page

**E 911 Address Fee for Unincorporated Areas: $55

ADMINISTRATIVE FEE $100 per hour plus mileage

Land Use Applications:

Variance**

Residential/Commercial Uses: $500

Plus Recording Fee: $46

Conditional Use**

Residential/Commercial Uses: $500

Plus Recording Fee: $46

Amendment to Existing Conditional Use Permit** $500

**The above land use applications may be subject to construction permit costs previously listed

Zoning Map Amendment (Rezoning): $500

Dirt Moving/Fill Excavation (Variance): $500

Adopted February 14, 2017

Plus Recording Fee: $46
Plus Re-Inspection Fee: $100
Appeal to Board of Adjustment: $500
Plus Recording Fee: $46

Zoning Ordinance Amendment: $500+ Printing Costs

Subdivision Applications:

Metes and Bounds

With any parcel resulting in less than 10 acres: $300
With parcels resulting in greater than or equal to 10 acres: $75
Plat or Planned Unit Development**
Initial Review by County Board: $250
Preliminary Plat: $500 + $25.00 per parcel
Final Plat: $500 + $25.00per parcel

+Surveyors Fees

**After the Fact Land Use Application Fees (Paid at the time of filing) Triple Original Fee**

TOWERS (Commercial Use)

Tower Base up to 1000 sq. ft.: $400
Tower Base 1001 sq. ft. to 2000 sq. ft.: $500
Antenna co-location: $300 per antenna

Equipment structures up to 1000 sq. ft.: $300
1001 to 2000 sq. ft.: $400

** Land Use Permits are required after approval.

** All new construction must have an E911 Address to obtain utility permits.

**Commercial Land Use Application, Plat/Planned Unit Development Review Costs

**The applicant shall reimburse the Township for all related miscellaneous costs that exceed the amount of the original application fee